Energy Storage –
GO! MALL
GO! Mall is a nationwide chain of shopping malls and hypermarkets in Vietnam, operated by Central Retail, one of Thailand’s leading multi-sector retail groups.
The Battery Energy Storage System (BESS) project involves the deployment of advanced energy storage technology at GO! Thăng Long, the highest electricity-consuming site within Central Retail’s Vietnam portfolio. The system helps optimize energy usage, reduce electricity costs during peak demand periods, and enhance grid stability.
Project information
- One of the first BESS projects in Vietnam
- Minimize the use of parking space
- Turnkey project covering development, design, procurement, and contract management
- Advanced engineering design
- Load shifting: Shift electricity consumption from peak hours to off-peak hours to optimize energy costs
- Compliance with international standards
- Generator (GenSet) Integration: Enables the BESS to continue operating during grid outages or power interruptions
- Compact containerized solution: The entire 1 MW / 2.3 MWh system is housed within a single 20-foot container
- Proven technology: Backed by a long-term performance guarantee.
- Shift 15% of peak load to off-peak hours
- Reduce electricity costs and peak demand charges
- Ensure a reliable power supply for operations
- Reduced grid dependence and carbon emissions
Key figures
2.3 MWh
Storage capacity
1,000 kW/ 2,300 kWh
Batteries installed
0%
CAPEX from client